Use compositive data to improve productivity

  • Time:
  • Click:88
  • source:MOMEYER CNC Machining
Production company of Knoll machine tool is in the machine tool used Eplan Cabinet software in the design of electric ark, use this one software, can realize the design of machine tool wiring of automation and plank shield design. Use the result of the design reentry of software of Eplan Electric P8 to be changed all right, can shorten further the time of research and development of electrical system. In these tool software, electric engineers can use software platform inside grand with off-the-peg module. The production that always has cutting to metallic stuff machines a process, metropolis generation metal cuts bits, these metals cut bits to must want to machine an area to keep clear of inside the country from the machine tool; In the meantime, the cooling fluid that contains lube and contaminant also should reclaim as far as possible recycle. The production company of Knoll machine tool that is located in Bad Saulgau city has banner technology in this one domain. This medium-sized company shares a worker to make an appointment with 750 people, be offer scrap technically to carry for metallic treatment company filter with cooling fluid the professional firm of device, the product of rich diversity is had in this one domain, can offer for machine treatment product line include cooling pumping station, cooling fluid to reclaim pumping station and the complete set equipment such as the disintegrator that cut bits, it is one can offer concentration control and the systematic supplier that dispersive type controls a solution. The graph shows 1 times the cooling fluid that makes for Knoll company production supplies and filter equipment: Control type cooling fluid is supplied and filter centrally equipment. The cooling fluid that production of graph 1Knoll company makes supplies and filter equipment: Control type cooling fluid is supplied and filter centrally below circumstance of equipment great majority, knoll company is machine tool manufacturer people offer can install the equipment with the compact structure on the machine tool directly, also design the large equipment of whole set for final user research and development. The concentration that research and development of manufacturer ZF company designs the transmission major that is Friedrichshafen harbor for example and produces production cooling fluid filters equipment; To ZF company many 50 metal machines the cooling fluid of the machine tool to undertake filtering, the capacity of cooling fluid box is as high as 160000L, discharge is 14000L/min. High-powered cooling fluid filters no matter equipment is to centralize control or dispersive control, this kind of large cooling fluid filters equipment is having quite tall property: Great majority cooling fluid can be answered afresh with, filter come out cut bits very dry, the raw material that can serve as fusion directly is used. Besides filter besides the skill of engineering technology respect, filter the electric control system that equipment place uses also is having important sense, it is its high-powered premise. Filtering largely in equipment, also cannot leave of course large, assume cooling fluid to supply, cleanness and heat the electric control ark of 3 big jobs, and the control technology that place of ark of this kind of large and electric control uses is very vital also, because the port of utilization rate of facilities the sources of energy is more and more principal. Anton Forstenh of leader of Technical Division of Knoll company electric design? Mr Usler says: "Great majority filters equipment uses rotate speed adjustable pump, make thereby filter equipment can need automatic speed change actually according to what cooling fluid filters, match according to producing condition and manufacturing process to hold property, for example according to discharge, be machined of the material of the spare parts, grain more or less to undertake modulatory with size. " careful adjustment controls a technology, make the KSS high-powered filter of VLX series annual can managing 60000kW.

The sources of energy of H. Use these electric power, the iron tower of moxa humble Er that can think Paris is famous is offerred full nightly illume of 6 days. The CAD software that uses modernization has company of electric design Knoll technology of very perfectness and electric control, having very strong production engineering capability; What their engineers use when the job is the modernest tool. Anton Forstenh? The electric engineers that Mr Usler leads, the Eplan Cabinet software of use 3D undertakes electric ark designed the time that has had a year or so (graph 2) , the electric ark design of complete set is made is to use this software comfortable finish conveniently, generates data also can be used at cable wiring (graph 3) . Electric ark is being controlled filter the cooling fluid of equipment is supplied, clear and heat 3 big jobs (graph 4) , tool of this one software is in the products plan phase of whole and electric ark is very useful, can accelerate a product to put in the speed of the market. What with this software the design comes out is fundamental circuit picture, in software, each of electric ark yuan parts of an apparatus has proper installation place, undertook collision, interference is checked, considered individually yuan the least removed demand between parts of an apparatus. Graph plans of yuan of 2 Nextpage of parts of an apparatus that install electric ark in 3D view with Eplan Cabinet software the electric ark design of 3 complete set is made is to use Eplan Cabinet software comfortable finish conveniently, generates data also can be used at cable wiring to pursue 4 electric ark are being controlled filter the cooling fluid of equipment is supplied, clear and heat the design of the cable wiring that software of 3 big jobs uses at transmitting data, information and electric ark casing, stylist people special to workload of reductive of place of this one software satisfaction. Anton Forstenh? Mr Usler say: "The design of electric ark made big earth simplify. The component of electric box can simple and quick suspension is sold in fixed position on, need to be opposite only the position according to the regulation puts yuan of parts of an apparatus can. " software system automatically basis two yuan of position between parts of an apparatus, definite place needs the length of cable. Be in when electric ark on the computer after implementation is visible, can transmit the data of this one electric ark to the manufacturing management department of the enterprise. A group of data are used at producing the cable with appropriate length; Another group of data transmit electric ark to make a workshop automatically, gold of electric ark Ban will be finished according to these data over production is made. Straightway data passageway comes so, knoll company arrives from products plan between manufacturing treatment formed a straightway data channel. In cable wiring, have similar method so, but the software that should use manufacturer of a machine tool scarcely, and it is the old product a few years ago. Software of this kind of craft has been replaced by the Eplan Cabinet place of 3D at present. 3D view brings very great help to design work (graph 5) , anton Forstenh? Mr Usler says: "This kind replaces be of course. Because our target is: Use system of a software to finish all jobs of electric design only, need not be in when design, production among reuse changeover interface. Yuan of parts of an apparatus in electric ark is decorated below 3D means, can spare many time (graph 6) . " graph 53D view brings Nextpage of very great help to pursue to design work yuan of 6 parts of an apparatus in electric ark is decorated below 3D means, after can spare many time was finishing corresponding preparation to work, everything undertakes very smoothly. Anton Forstenh? Mr Usler says: "We saved a lot of time, because be in each project, omited so must production prepares workload. When although be in,beginning, we need to give regular job more, better component module is designed in software or component grand. But these paying is worthiness, the time that brings because of place is spare special and considerable. " accordingly, the 90 % of project of electric now design are to use this one software to finish almost. Original, the manufacturing workmanship of electric ark revises very agile: After if be opposite,design circuit graph undertakes modification, can give orders directly aborning is carried out; But these modification cannot get effective monitoring, did not come true to producing a course " tie " . This kind of method was to get quickly carrying out fulfilling it seems that, but the risk with also existing particular, the content that modifies for example does not have whole report and record. Now, production makes employee go to these modification feedback in project of electric ark design, enter Eplan Cabinet system directly, can form relevant record and report naturally. This kind of tie to producing a course is being produced at the beginning the workshop thinks too too trival, work through designing the explanation of personnel and specification, people realises finally: Straightway data can avoid wrong occurrence, assure reliable high quality, and high quality also just is the user expectation to Knoll company. Divide managing design time besides this one advantage, the use person of Eplan Cabinet software is outstanding still emphasized examining in collision, interference the advantage of the respect. Use this one function, OK and reliable ground assures yuan of parts of an apparatus in electric ark to be put in optimal position, ensured reasonable the smallest span. The useful data that Eplan Cabinet software generates also is its advantage: Circuit graph, yuan list of parts of an apparatus, hookup must come out directly according to the data of Eplan, still can use these data to be used for order. These are same also can spare time, improved the communication with the user, the satisfaction that improved an user is spent. Apparently spare when editor file reports time is in cost budget, eplan Cabinet software is very satisfactory also, the data that Knoll company plan generates CAE software place next is used at cost budget in. In their present list, already one column expressed individually yuan the price of parts of an apparatus; What what lack is to come from ERP (company natural resources manages) when systematic ship-fitter. In the future, these data also want collect to arrive in Eplan data, to in those days, embrace promising to finish cost straightwayly estimated way, can undertake with CAx system and ERP system data is exchanged smoothly. Graph 7 in electric design process, can use what weave beforehand, represent component grand next working key is remained use fulfil, and had had quite great progress: Knoll company had begun by the Eplan 5 changeover to Eplan Electric P8, so that make base oneself upon of whole and electric design at newest Eplan platform. In electric design process, can use what weave beforehand, represent component grand (graph 7) . To in those days, electric design engineer can be used grand will undertake designing, raise design rate further thereby. These grand can use existing component data model adequately, can reveal unifiedly in electric ark, also ensured very high design quality level at the same time. CNC Milling